Water Challenge, founded in Madrid in 2020, developed ASEC (adiabatic sonic evaporation and crystallisation), a process that separates polluted liquids into water and dry solids without chemicals. Its EIC application said it had "the first energy-efficient truly Zero Liquid Discharge (ZLD+) technology able to separate 100% of dredged material into fresh water and crystalized solids in one step", and aimed "to develop a pilot plant of 10 m3/day of capacity" to showcase it before replicating it across Europe, according to CORDIS.

The European Innovation Council granted €2,458,928 towards a €3.51 million project from March 2023 to February 2025. The final report says the pilot plant was built and tested at the company's site, then installed in the Port of Huelva, where it "is fully operative with a depuration capacity of 10m3/d", producing distilled water and crystallised solids and powered in part by renewable energy. It says the technology reached TRL 7, and notes that the solids from mining-polluted sediments near Huelva contain critical raw materials of commercial value. The report also says that thanks to "Equity and the participation of the European Investment Bank (EIB)" the company expanded internationally, a claim not confirmed by any EIB announcement found for this article.

€2.46MEIC grant, 70% of a €3.51M project
10 m³/dayPilot capacity, Port of Huelva
TRL 7Reached, per report
€0.5-1MAnnual turnover band

Company file

Legal entity
Water Challenge S.L., Madrid
Founded
December 2020
Technology
ASEC, adiabatic sonic evaporation and crystallisation
Pilot site
Port of Huelva
Programmes
Moeve Light Up, 2025
EIC project
1 Mar 2023 to 28 Feb 2025, closed
EIC funding
Grant first

Where Water Challenge Stands Now

In December 2025 Water Challenge was one of nine start-ups chosen from more than 300 applicants for Moeve Light Up, the innovation programme of the Spanish energy company Moeve, and will develop an industrial pilot with Moeve's technical team, according to its blog. It has also presented ASEC for biogas and biomethane plants. Its annual turnover is between €500,000 and €1 million, Empresia reports. No commercial plant or port contract has been announced.

"This milestone is a shuttle for the technology; it works as demo for other ports."

Water Challenge, final report to the EIC

The Technology: Evaporate, Crystallise, Reuse

Dredging keeps ports and rivers navigable but produces huge volumes of sediment, 20-40% of it highly polluted, which is usually dumped at sea or in landfills, the application says. ASEC evaporates the water and crystallises the solids with low energy use, so both can be reused. Water Challenge now also pitches it for industrial liquid waste, saying it can reuse 100% of the water in contaminated fluids.

What the EIC Project Promised, and What CORDIS Shows

The project promised a 10 m³/day pilot to demonstrate the technology and business model. The report documents the pilot running in a real port at the target capacity, with lab validation of its outputs. It does not report energy figures in full, operating costs or a paying customer. CORDIS lists the project as closed.

  1. 10 m³/day pilot plantDeliveredPort of Huelva.
  2. Validated outputsDeliveredWater and solids tested.
  3. Business model shownUnverifiedNo contract announced.
  4. Replication in EuropeUnverifiedNone announced.

The Money

The grant was worth more than twice Water Challenge's annual turnover. The report's reference to EIB participation could not be matched to a public EIB operation. The company's investors, profit or loss, and any EIC Fund investment are not public.

What Cannot Be Checked

Questions for the EIC

What the pilot's energy use and cost per cubic metre are, whether any port has ordered a plant, what EIB involvement the report refers to, and whether the Moeve pilot has started are not public.

Why Europe Should Care

Polluted dredged sediment is a costly problem for European ports, and recovering water and raw materials from it fits EU circular economy goals. The EIC funded a working pilot in a Spanish port. Proof that ports will pay for it is still missing.

What the project promised

A 10 m³/day pilot to showcase zero-liquid-discharge treatment of dredged material before European rollout.

What the record shows

A working pilot in Huelva at TRL 7, a Moeve programme place, and turnover under €1 million.

The Verdict

Pilot delivered, market unproven

Water Challenge built the plant the EIC paid for and ran it in a port. It has yet to turn that demonstration into commercial orders.