Kitemill, founded in Voss, Norway, in 2008, develops airborne wind energy: a tethered, drone-like wing that flies in loops at altitude, where winds are stronger and steadier, pulling a cable that turns a generator on the ground. It flies its KM1 system at a test centre at Lista in southern Norway. Its EIC Accelerator project, "Airborne Wind Energy: Innovative KM2 AWE System by Kitemill", receives an EU contribution of €2,499,000 and ran from October 2024 to 30 September 2026, according to CORDIS. KM2 is its larger, 100 kW system.

The project's first report, updated in January 2026, describes progress on the KM1, not the KM2: consistent performance and high automation in tests, autonomous landing tested within visual line of sight, and simulation tools used to design and validate KM2, according to CORDIS. Kitemill says it currently flies the KM1, according to Kitemill. No KM2 flight results have been published. Kitemill's 2025 accounts show operating income of NOK 7.4 million, a net loss of NOK 11.6 million and 15 employees, according to the Brønnøysund Register Centre.

€2.5MEIC grant
100 kWKM2 rated power
-NOK 11.6MNet loss, 2025
0Published KM2 flight results

Company file

Legal entity
Kitemill AS, org. no. 992 943 718
Founded
July 2008, Voss
Test centre
Lista, southern Norway
Systems
KM1 (flying), KM2 (100 kW, in development)
Lead investor, 2023
Voss Energi
Other EU funding
€3.35M Innovation Fund for NAWEP
EIC funding
Blended finance, €2.5M grant

Where Kitemill Stands Now

Kitemill's website lists a project with the utility Sør Energi at Lista for up to five systems, the second of which was installed in 2022, and NAWEP, for which it won €3.35 million from the EU Innovation Fund to build and operate its first 12 systems, according to Kitemill. It says a proof-of-concept system already produces energy automatically. In 2023 it raised equity through crowdfunding with the utility Voss Energi as lead investor, according to Renewable Energy Magazine. It ended 2025 with equity of NOK 42.7 million.

"Accumulating operational experience with small-scale plants is much more cost-effective than scaling at an early phase."

Kitemill, website

The Technology: A Kite on a Cable

Airborne wind energy replaces a turbine tower with a flying wing on a tether that pulls a generator on the ground as it flies. The big challenge is flying safely and automatically for long periods, which is why autonomous landing and beyond-visual-line-of-sight flight were central to the EIC project.

What the EIC Award Promised, and What the Record Shows

The project aimed to commercialise the KM2. It ended on the day this article was written, and the public record shows automation progress on the KM1 and simulation work for the KM2. There is no published evidence that the KM2 has flown, been certified for beyond-line-of-sight operation or been sold.

  1. Autonomous operationKM1 progressLanding tests.
  2. KM2 designIn simulationProject report.
  3. KM2 flightUnverifiedNo results published.
  4. Commercial launchNot yetNo sales announced.

The Money

Kitemill is funded largely by grants and small equity rounds. Its 2025 operating income of NOK 7.4 million came with an operating loss of NOK 8.2 million. The award was blended finance; no EIC Fund investment has been announced.

What Cannot Be Checked

Questions for the EIC

Whether a KM2 has flown, how many systems operate at Lista, how much of Kitemill's income is grants, and whether the EIC Fund invested are not public.

Why Europe Should Care

Airborne wind energy promises wind power without tall towers, from higher-altitude winds. Kitemill has been working on it for 18 years and has European funding from several programmes. The KM2 was meant to be the step from demonstration to product.

What the award promised

Commercialisation of the 100 kW KM2 airborne wind system.

What the record shows

KM1 autonomy progress, KM2 in simulation, continuing losses.

The Verdict

Still in the test phase

Kitemill improved its small system with EIC money. The larger machine the award was for has not publicly flown.